JOURNAL OF KUNMING METALLURGY COLLEGE ›› 2014, Vol. 30 ›› Issue (4): 57-62.DOI: 10.3969/j.issn.1009-0479.2014.04.014
Previous Articles Next Articles
ZHANG Feng
Received:
Online:
Published:
Abstract: Reasonable pricing of Construction projects in project procurement management is a key factor for cost controlling, and is one of the core contents of China′s construction engineering project management system reform. The difference between the fixed pricing model and BOQ was analyzed by using the system of project management. The differences of implementation principle, procurement purpose,and Method of Evaluation of Bid between two modes have been reported.The results provide a new thinking of engineering quantity understanding from the “overall situation” point for bidding mode; promote the efficient use of engineering quantity list to purchase, so as to improve the efficiency of the management of construction projects.
Key words: BOQ pricing, tendering and bidding, fixed quotapricing, project procurement managemen
CLC Number:
TU723.2
ZHANG Feng. Comparative Study on Two Kinds of Pricing Mode of Construction Bidding Procurement[J]. JOURNAL OF KUNMING METALLURGY COLLEGE, 2014, 30(4): 57-62.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://kmyzxb.magtech.com.cn/EN/10.3969/j.issn.1009-0479.2014.04.014
http://kmyzxb.magtech.com.cn/EN/Y2014/V30/I4/57