Welcome to Journal of Kunming Metallurgy College! Today is Share:

Journal of Kunming Metallurgy College ›› 2020, Vol. 36 ›› Issue (3): 9-13.DOI: 10.3969/j.issn.1009-0479.2020.03.002

Previous Articles     Next Articles

Schemes in Hongnipo Copper Mine Study on the Comparative Selection of Underground Filling

YANG Ze,LU Ping,HUANG Jianjun   

  1. 1.Kunming Engineering &Research Institute of Nonferrous Metalurgy Co.,Ltd.,Kunming 650231,China;2.Faculty of Metallurgy and Mining Engineering,Kunming Metallurgy College,Kunming 650033,China
  • Received:2020-03-06 Online:2020-09-19 Published:2020-12-10

Abstract: Hongnipo Copper Mine is characterized by large amount of resources,high grade ( up to 1.67% ) ,easy separation and stable rock. But the surface covers farmland,part of industrial facilities and villages,which is a“three mining”deposit with complex mining conditions,so aiming at the safety of surface facilities and the safety of the next orebody mining,the scheme of cemenled filling with full tailings + graded crushed gypsum body and the scheme of cemented filling with graded tailings are put forward respectively. In addition,the two filling schemes are systematically compared and analyzed from the main technical and economic indicators such as system construction cost and operation cost. The results show that the scheme of full tailings + graded crushed gypsum body gravity flow + pumping filling has the advantages of low operation cost,low total filling cost(24.78 yuan/t) and high ore recovery rate.Finally,the scheme of full tailings + graded crushed gypsum body gravity flow + pumping cemented filling is determined.

Key words: filling method, total tailings, classified tailings, technical and economic comparison, operating expenses

CLC Number: