欢迎访问昆明冶金高等专科学校学报官方网站,今天是 分享到:

昆明冶金高等专科学校学报 ›› 2025, Vol. 41 ›› Issue (3): 1-.DOI: 10.3969/j.issn.1009-0479.2025.03.001

• 资源开发与测绘 •    下一篇

基于 3DMine+自研工具 +SuperMap的 矿山智能开采规划技术体系构建

  

  1. 1中国电建集团昆明勘测设计研究院有限公司信息技术研究院,云南 昆明 650051; 2昆明冶金高等专科学校实训与创新创业学院,云南 昆明 65003
  • 收稿日期:2024-06-19 出版日期:2025-06-07 发布日期:2025-09-22
  • 作者简介:张一丁 (1996-),男,云南文山人,工程师,工学硕士,主要从事矿山开采规划、矿山测量等研究。
  • 基金资助:
    中国电建集团科技项目 “绿色砂石智慧矿山关键技术应用研究”(DJ-ZDZX-2023-01)。

Research on the Construction of Intelligent Mining Planning TechnologySystem for Mines Based on 3DMine + Self Developed Tools + SuperMap

#br#   

  1. 1. Information 'T'echnology Research Institute, Power China Kunming Engineering Co., Ltd., Kunming 650051, China;Faculty of Engineering Training and lnnovation Entrepreneurship, Kunming Metallurgy College, Kunming 650033, China
  • Received:2024-06-19 Online:2025-06-07 Published:2025-09-22

摘要: “绿色砂石,智慧矿山”理念的提出加速了全国范围内砂石行业向着规模化、产业化方向发展。依据广 州市花都区花山镇城西石场 “绿色砂石、智慧矿山”的建设标准及内容要求,采用基于 3DMine+自研工具 + SuperMap的技术路线,对新型绿色矿山智能开采规划技术体系进行构建研究。在应用 3DMine进行砂石矿山模型 构建的基础上,采用自研工具进行采剥计划自动化分析生成,最后基于 B/S架构应用 SuperMap对智能开采规划 成果进行数字孪生构建展示。经广州市花都区花山镇城西石场建筑用花岗岩矿项目智慧矿山工程实践验证,基 于 3DMine+自研工具 +SuperMap构建的矿山智能开采规划技术体系,与新型绿色砂石产业结构相适配,具有较 高的工程实现价值与可执行性,可为其他矿山企业在矿山智能开采规划方面提供新的解决思路和借鉴方向。

关键词: 绿色砂石, 智慧矿山, 智能开采规划, 数字孪生, 技术体系

Abstract: The concept of “ green sand and gravel, smart mining” has accelerated the nationwide devel-opment of the sand and gravel industry towards scaling and industrialization. Based on the constructionstandards and requirements for the “ green sand and gravel, smart mine” at Chengxi Stone Quarry in Hua-shan Town, Huadu District, Guangzhou City, this study focuses on building a new intelligent miningplanning technology system for green mines. The technology route is based on 3DMine, self-developedtools, and SuperMlap. On the foundation of using 3DMine for constructing sand and gravel mine models,self-developed tools were used to automate the analysis and generation of mining and stripping plans. Finally, using the B/S architecture, SuperMlap was applied to construct and display a digital twin of the in-telligent mining planning results. Through practical verification in the smart mining project of the granitemine for construction in Chengxi Stone Quarry, Huashan Town, Huadu District, Guangzhou City, the in-telligent mining planning technology system based on 3DMine, self-developed tools, and SuperMap isfound to be compatible with the new green sand and gravel industry structure. It demonstrates high engineering implementation value and feasibility, providing new solutions and reference directions for othermining enterprises in the field of intelligent mining planning.

Key words: green sand and gravel, smart mining, intelligent mining planning, digital twin, technology system