昆明冶金高等专科学校学报 ›› 2021, Vol. 37 ›› Issue (5): 44-.DOI: 10.3969/j.issn.1009-0479.2021.05.007

• 资源开发与测绘 • 上一篇    下一篇

金厂河铅锌矿高阶段宽条带采场稳定性分析

刘顺斌1, 邓 柯2, 吴 东3   

  1. (1.金诚信矿业管理股份有限公司,北京101500;2.金川集团股份有限公司,甘肃金昌737100;3.昆明有色冶金设计研究院股份公司,云南昆明650051)
  • 收稿日期:2021-05-17 出版日期:2021-10-31 发布日期:2023-08-30
  • 作者简介:刘顺斌(1987-),男,四川仪陇人,工程师,工学硕士,主要从事采矿设计与岩石力学研究。

Analysis and Research on the Stability of High-Stage and Wide-Strip Stope in .Jinchanghe Lead-Zinc Mine

LIU Shunbin1, DENG Ke2, WU Dong3   

  1. (1.JCHXMiningManagementCo,Ltd,Beijing101500,China;
    2.JinchuanGroupCo,Ltd,Jinchang737100,Gansu,China;
    3.KunmingEngineering&ResearchInstituteofNonferrousMetallurgyCo.,Ltd.,Kunming650051,China)
  • Received:2021-05-17 Online:2021-10-31 Published:2023-08-30

摘要: 针对金厂河铅锌矿体产状稳定、矿体厚大、倾角缓、品位高、南北倾向短的特点,选择了高阶段大直径深孔侧向崩矿嗣后充填采矿法,同时阐述了该采矿方法的开采工艺。为确保生产过程中该采矿方法安全使用的可靠性及合理性,采用岩土FLAC3D软件对15m宽的条带两步骤回采(一步骤回采矿柱;二步骤回采矿房) 进行稳定性分析论证。模拟结果表明:采用隔一采一的方式,每步骤15m宽的条带开挖后,采空区周边围岩出现塑性扰动区较小,整体处于稳定状态,验证了该采矿工艺安全、高效、成本低,具有一定的可行性和合理性,为矿山的安全高效生产提供了理论依据支撑。

关键词: 高阶段, 宽条带, 稳定性, 胶结充填体, 大直径深孔崩矿

Abstract: According to the characteristics of stable occunence, thick ore body , gentle dip angle,high-garde and short north-south trend d ore body in Jinchanghe Lead-Zinc,the high stage large diameterdeep hdle side caving and subsequent filling mining method is selected , at the same time,the mining.technology of the mining method is described). In axder to ensure the reliability and rationality of sahe useof the mining method in the production process ,the stability analysis and demonstration of 15 m widestrip two-step stoping ( one-step stoping pillar , two-step stoping room) is simulated by FL.AC software.Simulation results show that using the method d mining every other , the plastic disturbance area of sur-rounding rock around the goaf is smal , and the whole area is stable after each 15m wide-strip has mined ,which proves that the mining method has the advanftages of salety , high efficiency and low cost , and hascertain feasibility and rationality.The research results provide a theoretical basis for the safe and efficientproduction of the mine.


Key words: high-stage, widestrip, stability, cementedfillingbody, largediameterdeepholestoping