公路隧道工程进度控制策略分析

张玮a,王敏b,孙俊玲a,赵霞a,杨平a,冉茂华a   

  1. 昆明冶金高等专科学校a. 建筑工程学院;b. 人力资源处,云南昆明650033
  • 收稿日期:2016-04-06 出版日期:2016-07-23 发布日期:2016-07-23
  • 作者简介:张玮(1979-),女,吉林九台人,讲师,工程硕士,主要从事工程管理和项目管理研究。
  • 基金资助:

    昆明冶金高等专科学校基金:模糊综合评价法在实际工程中的应用——以昆武高速公路施工质量评价为例(14B002)。

Analysis of the Progress Control Strategy of Highway Tunnel Project

ZHANG Weia, WANG Minb, SUN Junlinga, ZHAO Xiaa, YANG Pinga, RAN Maohuaa   

  1. a. Faculty of Architectural Engineering; b. Human Resources Department, Kunming Metallurgy College, Kunming 650033, China
  • Received:2016-04-06 Online:2016-07-23 Published:2016-07-23

摘要:

       公路隧道工程进度能有效反映出公路隧道工程项目的执行与完成情况。在现阶段的公路隧道工程项目管理过程中,工期的控制已不能代表施工进度管理的全部,而是将项目任务造价、技术经济可靠性等其他因素结合到一起来考虑,从而将施工进度管理演变成另一种综合性指标,这种新的综合性指标可以更加精确的呈现出公路隧道工程的进展情况。在利用这种综合性新指标的同时将一些其他因素加以整合也尤为必要。具体包括:(1)严格按照合同要求,撰写施工进度计划;(2)依据“目标控制”来进行施工进度管理;(3)强化施工进度跟踪与隧道工程验收;(4)不断提高会计人员业务素质。关于公路隧道工程进度控制的改进方法包括:(1)加强人力资源的的供应保障和管理工作;(2)加强物资材料的周转供应和管理工作;(3)加强施工机具、设备的需要量计划和管理工作。

关键词: 公路隧道, 公路隧道工程进度, 工程施工

Abstract:

    Highway tunnel project progress can effectively reflect the implementation of the completion of the highway tunnel project. In the present highway tunnel project management process, time limit for a project control has not represent all construction schedule management.  The project task cost, technical and economic reliability and other factors were combined to consider. Thus the construction schedule management evolved into another kind of index. This new comprehensive index can more accurately show the progress of the highway tunnel project. It is necessary to integrate some other factors in the use of the new comprehensive index. Specific include: (1) strictly in accordance with the requirements of the contract, writing construction schedule; (2) according to the target control of construction schedule management; (3) strengthen the construction schedule tracking and tunnel engineering acceptance; (4) to continuously improve the quality of accounting staff. Improvement methods of highway tunnel construction schedule control include: (1) to strengthen the supply and management of human resource; (2) to strengthen the supply and management of materials; (3) to strengthen the construction equipmentequipmentthe need for planning and management of the work.

Key words: highway tunnel, highway tunnel project progress, engineering construction