SHEN Xu
Online:
Published:
Abstract:
In the production practice of a copper mine in (:hina,the production capacity- was improved by optimized practice of the process,eduipment and process parameters. Process flow and mineral processing technology indicators continued to improve,production eduipment achieved a large一scale,high efficiency,energy saving. Good economic benefits were achieved.
Key words: copper mine, ore dressing plant, process flow optimization, technological factor, technological transformation
CLC Number:
TD952
F426.1
SHEN Xu. Introduction to a Domestic Copper Concentrator Process Equipment Status and Optimize the Practice[J]. HPMug2oMmNrOfxWQHLiEksa6s0hFu9Ox348d7QefarYlaFR5ArkhOwm3Da1pmxmxCtenj1+6luWD#r#n+EPn9L6Ce+9onqnMlT+i, 2016, 32(1): 21-26.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://kmyzxb.magtech.com.cn/EN/10.3969/j.issn.1009-0479.2016.01.005
http://kmyzxb.magtech.com.cn/EN/Y2016/V32/I1/21
[1]沈旭.大红山铜矿一期选矿工艺设计的实践与思考[J].有色金属设计,1999,26(3):10-14. [2]李秀芬.大红山铜矿二选厂选矿设计中有关问题的探索[J].有色金属设计,2009,36(3):45-51,56. [3]王爱明.大红山铜矿二期工程磨矿流程的设计与实践[J].有色金属设计,2009,36(2):12-17. [4]王春,马丽珍.精确化装补球方法在大红山铜矿选矿厂的应用研究[J].云南冶金,2005,34(1):16-20. [5]《选矿设计手册》编委会.选矿设计手册[M].北京:冶金工业出版社,2004. [6]王资.浮游选矿技术[M].北京:冶金工业出版社,2007.