Welcome to HPMug2oMmNrOfxWQHLiEksa6s0hFu9Ox348d7QefarYlaFR5ArkhOwm3Da1pmxmxCtenj1+6luWD#r#n+EPn9L6Ce+9onqnMlT+i! Today is

Journal of Kunming Metallurgy College ›› 2022, Vol. 38 ›› Issue (6): 30-.DOI: 10.3969/j.issn.1009-0479.2022.06.006

Previous Articles     Next Articles

Research and Realization of the Optimization of Mine Ventilation Network

CHEN Lin1,XIE Yongqiang2,LUO Yunyong1   

  1. (1. Yunnan Jiantou Mining Engineering Co.,Ltd., Kunming 650501. China:2. Jiangsu First Industrial Design Institute Co. , Ltd. , Xuzhou 221000 , Jiangsu, China)
  • Received:2022-10-27 Online:2022-12-14 Published:2023-11-16

Abstract: To find a kind of air volume regulator which is effective and energy efficient, it is proposed toobtain the branch of air regulating door by linear programming model, and then obtain the resistance va.ue and fan speed by nonlinear programming model to realize the optimization of mine ventilation networkThe program is developed with Matlab, and the simulation is carried out through an instance. The resultsshow that the air volume of each branch of the mine ventilation network can meet the requirements , andthe total energy consumption of the ventilation network can be reduced. The proposed mathematical modeland method can well solve the optimization and regulation of the mine ventilation network

Key words: mine ventilation network: optimization and adjustment, linear programming: nonlinear pro-gramming

CLC Number: