Journal of Kunming Metallurgy College ›› 2020, Vol. 36 ›› Issue (1): 56-.DOI: 10.3969/j.issn.1009-0479.2020.01.010
Previous Articles Next Articles
LUO Wensheng,WANG Xiaoli,LI Shunmei
Received:
Online:
Published:
Abstract: Taking the third national land survey project in Shuangjiang County as an example, the paperelaborates the process and mode of quality control in the data production process of the land survey resultsin detail, and studies and discusses the way and implementation of the quality control of the land surveyresults. The quality control management of the survey project provides some new ideas.
Key words: land survey, achievement quality, quality control
CLC Number:
F301.2
LUO Wensheng, WANG Xiaoli, LI Shunmei. Implementation and Analysis of Quality Control of Land Survey Results[J]. Journal of Kunming Metallurgy College, 2020, 36(1): 56-.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://kmyzxb.magtech.com.cn/EN/10.3969/j.issn.1009-0479.2020.01.010
http://kmyzxb.magtech.com.cn/EN/Y2020/V36/I1/56