LIU Bingfeng,GENG Xiangwan
Received:
Online:
Published:
Abstract: This paper takes Xiushuihe mine as the engineering project, the formed H2 landslide as theresearch object, and evaluates the stability of three conditions ( the natural state, rainstorm and earthquake) by using the transfer coefficient method. Based on the analysis of the formation mechanism of thelandslide , the paper puts forward the prevention and control scheme of clearing and cutting the slope , andtakes the load increasing counter-pressure at the foot of a platform slope of 2 397 m. The total clearingvolume is 115. 23 x 10' m’, and the total back pressure rock volume is 6 881. 16 m’. Through the reason-able construction design guiding the engineering practice, the mine eliminated the hidden danger and achieved good results.
Key words: landslide prevention and control, stability analysis, counter-pressure at the foot of the slope
CLC Number:
P642.22
LIU Bingfeng, GENG Xiangwan. Study on the Control Scheme of H2 Landslidein the West of Xiushuihe Mine[J]. HPMug2oMmNrOfxWQHLiEksa6s0hFu9Ox348d7QefarYlaFR5ArkhOwm3Da1pmxmxCtenj1+6luWD#r#n+EPn9L6Ce+9onqnMlT+i, 2020, 36(5): 9-.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://kmyzxb.magtech.com.cn/EN/10.3969/j.1009-0479.2020.05.003
http://kmyzxb.magtech.com.cn/EN/Y2020/V36/I5/9